Interested in this AI/ML Engineer role at Bitdeer Technologies Group?
Apply Now →Skills & Technologies
About This Role
About Bitdeer
Bitdeer is a world-leading technology company for Bitcoin mining and AI cloud.
Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Apart from designing industry-leading ASIC chips and manufacturing mining rigs, the Group handles complex processes involved in computing across the value chain. This includes equipment procurement, transport logistics, datacenter design and construction, equipment management, and network and facility operations. Bitdeer also offers advanced cloud capabilities to customers with a high demand for artificial intelligence.
Headquartered in Singapore, Bitdeer operates globally with a diversified 3 GW energy portfolio, and deploys Bitcoin mining and HPC datacenters in the United States, Bhutan, Norway, Canada, Malaysia, and Ethiopia.
To learn more, visithttps://ir.bitdeer.com/
We are seeking
We are seeking an AI Datacenter Construction Cost Lead to own cost management and construction procurement across Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will set budgets, run competitive bids, manage contracts and change orders, and secure long-lead equipment so each project is delivered on budget and on time.
You will be the commercial backbone of the construction team, working with site construction managers, the TPM, design, finance, and supply chain. The ideal candidate brings hands-on data center cost engineering and procurement experience and a strong command of construction contracts.
Candidates will work on site as needed and should be based in one of the following areas, primarily in Texas and Ohio: Austin, TX; Rockdale, TX; Abilene, TX; Houston, TX; Dallas, TX; Massillon, OH; Clarington, OH; Columbus, OH; Akron, OH; or Pittsburgh, PA.
What you will be responsible for
Cost Planning & Control
- Budgets & Estimates: Develop conceptual and detailed estimates, cost plans, and control budgets for each build.
- Cost Reporting: Track committed, incurred, and forecast costs, and own Estimate at Completion (EAC) and cash-flow forecasts.
- Change Control: Review, negotiate, and track change orders, contingency, and allowances with clear documentation.
Procurement & Contracting
- Bid Management: Lead RFPs, bid leveling, and contractor and vendor selection for general contractor, trade, and equipment packages.
- Contract Administration: Prepare and administer construction and supply contracts, GMPs, and purchase orders with legal and finance.
- Long-Lead Equipment: Secure long-lead equipment (e.g., transformers, switchgear, generators, UPS, chillers, CDUs) and manage OFCI scope, delivery, and payment milestones.
Commercial Management
- Pay Applications: Review contractor pay applications, lien waivers, and retention for accuracy and compliance.
- Claims & Disputes: Manage commercial claims and support their resolution.
- Value Engineering: Lead value engineering and benchmarking to lower cost per MW without compromising quality or schedule.
Supplier & Market Strategy
- Supplier Relationships: Build a qualified base of contractors, trade partners, and equipment suppliers across US markets.
- Market Intelligence: Track pricing, lead times, and labor market conditions to inform budgets and procurement strategy.
- Cost Benchmarks: Build a cost database and benchmarks from completed projects.
How you will stand out
- Experience: 8+ years in construction cost management, quantity surveying, or procurement, with significant data center or mission-critical experience.
- Contracts: Strong knowledge of construction contract forms (e.g., AIA, ConsensusDocs) and GMP, lump-sum, and cost-plus models.
- Equipment Procurement: Experience procuring MEP trade packages and long-lead electrical and mechanical equipment.
- Cost Tools: Proficiency with estimating and cost control tools and advanced Excel.
- Education: Bachelor’s degree in Quantity Surveying, Construction Management, Engineering, or a related field, or equivalent experience.
- Certifications: Professional certifications such as RICS, AACE (CCP or CEP), or CPSM.
- Owner-Side Experience: Owner-side cost or procurement role at a hyperscaler, colocation provider, or AI infrastructure developer.
- Commercial Judgment: Protects the company’s position while keeping contractor relationships productive.
- Negotiation: Confident, well-prepared negotiator.
- Analytical Rigor: Builds accurate, auditable cost data.
- Integrity: Runs fair and transparent procurement processes.
What you will experience working with us
- A culture that values authenticity and diverse perspectives.
- An inclusive, respectful environment with open workspaces and an energetic, start-up spirit.
- A fast-growing company with opportunities to network with industry pioneers and enthusiasts.
- The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
- Involvement in new projects and in developing processes/systems.
- Personal accountability, autonomy, rapid growth, and learning opportunities.
- Attractive benefits and development such as training and mentoring.
-
Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.
Salary Context
This $140K-$180K range is below the median for AI/ML Engineer roles in our dataset (median: $180K across 1953 roles with salary data).
View full AI/ML Engineer salary data →Role Details
About This Role
AI/ML Engineers build and deploy machine learning models in production. They work across the full ML lifecycle: data pipelines, model training, evaluation, and serving infrastructure. The role has evolved significantly over the past two years. Where ML Engineers once spent most of their time on model architecture, the job now tilts heavily toward inference optimization, cost management, and integrating LLM capabilities into existing systems. Companies want engineers who can ship production systems, and the experimenter-only role is fading fast.
Day-to-day, you're writing training pipelines, debugging data quality issues, setting up evaluation frameworks, and figuring out why your model performs differently in staging than it did on your dev set. The best ML engineers are obsessive about reproducibility and measurement. They instrument everything. They know that a model is only as good as the data feeding it and the infrastructure serving it.
Across the 10,419 AI roles we're tracking, AI/ML Engineer positions make up 75% of the market. At Bitdeer Technologies Group, this role fits into their broader AI and engineering organization.
Demand for AI/ML Engineers has been strong and consistent. Unlike some AI roles that spike with hype cycles, ML engineering is a foundational need. Every company deploying AI models needs people who can keep them running, and the gap between research prototypes and production systems keeps growing.
What the Work Looks Like
A typical week might include: debugging a data pipeline that's silently dropping 3% of training examples, running A/B tests on a new model version, writing documentation for a feature flag system that lets you roll back model deployments, and reviewing a junior engineer's PR for a new evaluation metric. Meetings tend to be cross-functional since ML touches product, engineering, and data teams.
Demand for AI/ML Engineers has been strong and consistent. Unlike some AI roles that spike with hype cycles, ML engineering is a foundational need. Every company deploying AI models needs people who can keep them running, and the gap between research prototypes and production systems keeps growing.
Skills Required
Python and PyTorch dominate the requirements. Most roles expect experience with cloud platforms (AWS, GCP, or Azure) and familiarity with ML frameworks like TensorFlow or JAX. RAG (Retrieval-Augmented Generation) has become a top-3 skill requirement as companies integrate LLMs into their products. Docker and Kubernetes show up in about a third of postings, reflecting the production focus of the role.
Beyond the core stack, employers increasingly want experience with experiment tracking tools (MLflow, Weights & Biases), feature stores, and vector databases. Fine-tuning experience is valuable but less common than you'd think from reading Twitter. Most production LLM work is RAG and prompt engineering, not fine-tuning. If you have both, you're in a strong position.
Companies that are serious about AI/ML hiring tend to post specific infrastructure details in the job description: the frameworks they use, their model serving stack, their data pipeline tools. Vague postings that just say 'ML experience required' without specifics are often companies that haven't figured out what they need yet.
Compensation Benchmarks
AI/ML Engineer roles pay a median of $213,800 based on 16,346 positions with disclosed compensation. Senior-level AI roles across all categories have a median of $230,000. This role's midpoint ($160K) sits 25% below the category median. Disclosed range: $140K to $180K.
Across all AI roles, the market median is $214,834. Top-quartile compensation starts at $266,000. The 90th percentile reaches $321,730. For comparison, the highest-paying categories include AI Safety ($274,500) and Research Engineer ($252,000). By seniority level: Entry: $114,400; Mid: $193,200; Senior: $230,000; Director: $272,100; VP: $235,000.
Bitdeer Technologies Group AI Hiring
Bitdeer Technologies Group has 3 open AI roles right now. They're hiring across AI/ML Engineer. Positions span Columbus, OH, US, Austin, TX, US. Compensation range: $180K - $260K.
Location Context
Across all AI roles, 6% (580 positions) offer remote work, while 9,776 require on-site attendance. Top AI hiring metros: New York (3,785 roles, $222,480 median); San Francisco (3,262 roles, $261,300 median); Los Angeles (1,896 roles, $210,000 median).
Career Path
Common paths into AI/ML Engineer roles include Data Scientist, Software Engineer, Research Engineer.
From here, career progression typically leads toward ML Architect, AI Engineering Manager, Principal ML Engineer.
The fastest path into ML engineering is through software engineering with a self-directed ML education. A CS degree helps, but production engineering skills matter more than academic credentials. Build something that works, deploy it, and measure it. That portfolio project is worth more than a Coursera certificate. For career growth, the fork comes around the senior level: go deep on technical complexity (staff/principal track) or move into managing ML teams.
What to Expect in Interviews
Expect system design questions around ML pipelines: how you'd build a training pipeline for a specific use case, handle data drift, or design A/B testing infrastructure for model deployments. Coding rounds typically involve Python, with emphasis on data manipulation (pandas, numpy) and algorithm implementation. Take-home assignments often ask you to build an end-to-end ML pipeline from raw data to deployed model.
When evaluating opportunities: Companies that are serious about AI/ML hiring tend to post specific infrastructure details in the job description: the frameworks they use, their model serving stack, their data pipeline tools. Vague postings that just say 'ML experience required' without specifics are often companies that haven't figured out what they need yet.
AI Hiring Overview
The AI job market has 10,419 open positions tracked in our dataset. By seniority: 117 entry-level, 4,975 mid-level, 3,840 senior, and 1,487 leadership roles (Director, VP, C-Level). Remote roles make up 6% of the market (580 positions). The remaining 9,776 roles require on-site or hybrid attendance.
The market median for AI roles is $214,834. Top-quartile compensation starts at $266,000. The 90th percentile reaches $321,730. Highest-paying categories: AI Safety ($274,500 median, 90 roles); Research Engineer ($252,000 median, 580 roles); AI Engineering Manager ($250,811 median, 72 roles).
Demand for AI/ML Engineers has been strong and consistent. Unlike some AI roles that spike with hype cycles, ML engineering is a foundational need. Every company deploying AI models needs people who can keep them running, and the gap between research prototypes and production systems keeps growing.
The AI Job Market Today
The AI job market spans 10,419 open positions across 16 role categories. The largest categories by volume: AI/ML Engineer (7,849), AI Product Manager (516), AI Software Engineer (513). These three account for the majority of open positions, though smaller categories often have higher per-role compensation because of specialized skill requirements.
The seniority mix tells a story about where AI teams are in their maturity. Entry-level roles (117) are outnumbered by mid-level (4,975) and senior (3,840) positions, reflecting that most companies are past the 'build a team from scratch' phase and need experienced engineers who can ship production systems. Leadership roles (Director, VP, C-Level) total 1,487 positions, representing the bottleneck between technical execution and organizational strategy.
Remote work availability sits at 6% of all AI roles (580 positions), with 9,776 requiring on-site or hybrid attendance. The remote share has stabilized after the post-pandemic correction. Senior and specialized roles (Research Scientist, ML Architect) are more likely to be remote-eligible than entry-level positions, partly because experienced hires have more negotiating power and partly because these roles require less hands-on mentorship.
AI compensation is structured in clear tiers. The market median sits at $214,834. Top-quartile roles start at $266,000, and the 90th percentile reaches $321,730. These figures include base salary with disclosed compensation. Total compensation (including equity, bonuses, and sign-on) runs 20-40% higher at companies that offer those components.
Category matters for compensation. AI Safety roles lead at $274,500 median, while Prompt Engineer roles sit at $140,000. The spread between highest and lowest-paying categories reflects the premium on specialized technical skills versus broader analytical roles.
The most in-demand skills across all AI postings: Python (2,350 postings), Aws (1,173 postings), Azure (1,030 postings), Rag (986 postings), Gcp (714 postings), Pytorch (649 postings), Kubernetes (583 postings), Claude (581 postings). Python dominates, appearing in the vast majority of role descriptions regardless of category. Cloud platform experience (AWS, GCP, Azure) is the second most common requirement. The newer entrants to the top skills list (RAG, vector databases, LLM APIs) reflect the shift from traditional ML toward generative AI applications.
Frequently Asked Questions
Get Weekly AI Career Intelligence
Salary data, skills demand, and market signals from 16,000+ AI job postings. Every Monday.